Installation InstructionsFor Monsoon ExtraStandard Single Duty PumpMedium Pressure S1.4 bar High Pressure S3.5 barHigh Pressure S3.0 bar High Pr
- 10 -Certain installations may require additional earthing arrangements such as equipotential bonding. Reference should be made to the relevant regu
- 11 -Supply Cord ReplacementIf the supply cord is to be changed or is damaged, it must be replaced with a special cord assembly available from Stuart
- 12 -Supply Cord ExtensionThe pumps are fitted with a supply cord to the following specification:- Monsoon S1.4 bar:- . . . . . . . . . . . . . . .
- 13 -3. Priming The pump must be primed (filled with water) before starting. Turn on water supply, prime and vent the pump by unscrewing the p
- 14 -MAINTENANCEWARNINGS: Care should be taken to protect pump from frost and freezing, particularly when located in a loft installation. P
- 15 -TECHNICAL SPECIFICATIONStuart Turner reserve the right to amend the specification in line with its policy of continuous development of its produ
- 16 -NOISEThe equivalent continuous A-weighted sound pressure level at a distance of 1 metre from the pump does not exceed 70 dB(A).TROUBLE SHOOTING
- 17 -Flow Switch Circuit Test1. First confirm visually that the flow switch reed clamp have not been dislodged during handling or installation.
- 18 -GOOD PRACTICEAlways flush system prior to installing a new or serviced pump.Always ensure the pump is primed (filled with water) before startin
- 19 -YOUR 2 YEAR GUARANTEEStuart Pumps are guaranteed by Stuart Turner Limited to be free from defects in materials or workmanship for the applicable
- 2 -TYPICAL INSTALLATION (Hot Water, Standard Duty, Single Pump System)STEP 1 PUMP LOCATION (General)WARNINGS: The pump must not be located where t
Stuart Turner Ltd, Henley-on-Thames, Oxfordshire RG9 2AD ENGLAND Tel: +44 (0) 1491 572655, Fax: +44 (0) 1491 573704email: pumps@stuart-turn
- 3 -Hot Water InstallationsThe preferred pump location is at floor level next to the hot water cylinder or a level that is below the secondary tappin
- 4 -Diagram showing typical cold water boosting installation. Cold Water InstallationSTEP 2 PIPEWORK CONNECTIONS (General)WARNINGS: Ensure pipework
- 5 -The pipework feeds to the storage tank should be of adequate size to ensure replenishment rate of tanks is sufficient to meet needs of pump.Care
- 6 -Pipework Connections (Hot)When a hot water cylinder or storage tank is used, ensure the pipework size from the cold water storage to the hot wate
- 7 -Hose to PumpThe pump inlet and outlet ports have factory assembled fittings which are specifically designed for connection to the G¾ female runni
- 8 -4. Push pipe firmly into fitting, until pencil mark is level with the top of the collet and the pipe stop resistance is felt. Pull on pipe
- 9 -The pump should not be screwed down, ensure anti-vibration feet and flexible hoses are used.STEP 4 ELECTRICAL INSTALLATIONWARNINGS: The electri
Kommentare zu diesen Handbüchern